STRUCTURAL ENGINEERING & BRIDGE CONSTRUCTION — INDIA

Bridges engineered for the load India actually puts on them.

NovaBridge designs and constructs cable-stayed, girder, and truss bridges across India — engineered to IRC and IS code standards, and load-tested before a single vehicle crosses.

SPAN 480M CLEARANCE 42M LOAD CLASS IRC 70R
19 yrsbuilding bridges across India
84bridges delivered
310 kmcombined span constructed
14states served

WHAT WE BUILD

Six kinds of crossing, one engineering standard.

Every project starts from the same discipline, whatever the span or the site.

TYPE-01

Cable-stayed bridges

Long-span crossings where a conventional girder can't reach — rivers, gorges, and wide waterways.

TYPE-02

Box girder & viaducts

Elevated corridors and flyovers built for continuous urban and highway traffic.

TYPE-03

Truss bridges

Steel truss spans engineered for rail crossings and heavy freight corridors.

TYPE-04

Foot overbridges

Pedestrian crossings designed for stations, highways, and high-footfall crossings.

TYPE-05

Rehabilitation & retrofitting

Structural assessment and reinforcement for aging bridges still carrying live traffic.

TYPE-06

Geotechnical & site survey

Soil testing, hydrology, and foundation design before a single pillar is poured.

FOUR STAGES

From site survey to load test, in that order.

01 / SURVEY

Survey

Site survey, soil testing, and hydrology study before any design work begins.

02 / DESIGN

Design

Structural design engineered to IRC and IS code loading standards, reviewed before approval.

03 / CONSTRUCT

Construct

Phased construction with on-site quality checks at every pour and every weld.

04 / HANDOVER

Test & handover

Full load testing against design specification before the bridge opens to traffic.

SELECTED WORK

Recent crossings, by the numbers.

Madhya Pradesh

Narmada Crossing

TYPECable-stayed
SPAN420m
DECK22m
YEAR2024

Karnataka

Kaveri Link Bridge

TYPEBox girder
SPAN680m
DECK18m
YEAR2023

Assam

Brahmaputra Approach Span

TYPETruss
SPAN310m
DECK16m
YEAR2025

Maharashtra

Sahyadri Foot Crossing

TYPEPedestrian
SPAN140m
DECK4m
YEAR2024

SAFETY & COMPLIANCE

A structure is only as good as the standard it's built to.

0

lost-time incidents across active sites this year

100%

of projects load-tested before handover

14

on-site quality engineers across current projects

3rd

party inspection on every major pour

  • Designed to IRC (Indian Roads Congress) and IS code specifications
  • Independent third-party load testing before handover
  • On-site quality engineers at every phase, not just final inspection
  • Documented material traceability for every structural pour

FROM PROJECT PARTNERS

What clients say.

“Every deadline they gave us, they hit — and the load test numbers matched the design spec exactly.”

R. DESHMUKH — Executive Engineer, State PWD

“They flagged a soil issue at survey stage that would've cost us a redesign later. That's the team you want on a bridge project.”

A. KRISHNAN — Project Director, Infrastructure Developer

“Communication with the site team was constant — we always knew exactly where the project stood.”

S. BANO — Municipal Infrastructure Officer

QUESTIONS

Good to know.

Timelines depend on span, site conditions, and approvals, but most mid-span projects run 18–36 months from survey to handover.

Yes — NovaBridge works with state PWDs, municipal bodies, and private infrastructure developers.

All structural designs follow IRC and IS code specifications, with independent load testing before handover.

Both — site survey, soil testing, and hydrology studies are part of every project from day one.

Yes — structural assessment and retrofitting of aging bridges is one of our core capabilities.

Have a crossing that needs engineering, not guesswork?

Tell us about the site and we'll send an assessment team.

Request a project assessment